E.ON has invested in the wind farm project called Nysäter that will produce 475 MW. The farm will be built jointly with Credit Suisse Energy Infrastructure Partners (CSEIP). CSEIP will own 80 % of the project and E.ON will own the remaining 20 %. E.ON will be operating the farm once it is completed.